EAWR 1989 & HSE GS38 SIMULATION
Safe Isolation 10-Point Lockout Drill
Safe isolation is the most critical procedure in the electrical industry. A single skipped step or wrong sequence in the AM2 or on-site can lead to immediate failure or fatal electric shock. Complete all 10 legal steps in sequence.
Main Isolator · Consumer Unit RigBS 7671 / 230V AC Single Phase
100A Double Pole IsolatorControls incoming supply to installation
Point of Work Outgoing Terminals (Click 2 terminals to probe voltage):
LINE (L1 · Brown)
NEUTRAL (N · Blue)
EARTH (CPC · Green/Yellow)
GS38 Voltage Detector ReadingProbes ready
--- V
Electrician's Tool Tray & Protocols